^

Water resistant cofferdams

Construction and installation of a steel footbridge and of a steel security gate

Measures to reduce flood from the river
«Attert» in Bissen (Luxembourg)

Installation of two sealed cofferdams on 3 sides electric gearmotor.

  • Width = 3 400 mm
  • Depth of channel = 3 000 mm

Construction and installation of a steel footbridge and of a steel security gate over the Mühlen channel.